Norris Middle School D-15 Classroom-to-Office Conversion

Our team transformed an existing classroom (Building D-15) at Norris Middle School in Bakersfield, California, into a fully functional administrative office suite. The scope included complete interior demolition, careful removal and relocation of existing cabinetry, installation of new HVAC supply and return lines with dedicated zoning, modification and extension of the fire alarm system to meet current code requirements, and construction of a new partition wall with a secure exterior door. Following structural and systems work, we repaired interior drywall and exterior stucco, applied fresh paint throughout, and finished the space with new commercial-grade carpet and base. The converted room now provides Norris School District staff with a bright, modern office environment while maintaining full compliance with educational facility standards – all completed during summer break with zero impact to the school year.
Kern County Superintendent of Schools

Larry E. Reider Education Center, 4th Floor Tenant Improvement

Our team delivered a full-scale tenant improvement on the 4th floor of the Larry E. Reider Education Center in Bakersfield, California. The project transformed the space through demolition and reconfiguration of interior walls to create a modern open-office layout, relocation and modification of existing HVAC ductwork for improved airflow, complete removal and reinstallation of the acoustic ceiling grid and tiles, and installation of new Systimax structured cabling for high-performance data and communication infrastructure. We upgraded the electrical systems with additional circuits, power outlets, and energy-efficient LED lighting, installed new doors with matching frames and hardware, repaired and finished drywall, applied fresh paint throughout, and completed the space with new commercial-grade carpet tile and base. The result is a bright, functional, and contemporary work environment that meets current building codes and provides KCSOS staff with a refreshed and highly efficient office space, all delivered on schedule with minimal disruption to the building’s daily operations.
Kern High School District

Arvin High School Gymnasium – Full HVAC System Replacement

Our team completed a comprehensive replacement of the outdated HVAC system serving the Arvin High School gymnasium in Arvin, California. The project included complete demolition and removal of the existing rooftop units and associated equipment. To accommodate the increased weight of the modern, higher-efficiency units, we designed and installed supplemental structural steel members. New custom equipment stands were framed and erected, followed by sheetrock repair, reinstallation of suspended ceiling tiles, and full repainting of affected areas for a seamless finish. All new refrigerant lines, condensate drains, and electrical connections were installed and fully protected with proper insulation and conduit. The upgraded system delivers improved temperature control, better air quality, and enhanced energy efficiency for the gymnasium while restoring the space to like-new aesthetic condition. Work was performed during summer break with strict scheduling to ensure the facility was fully operational for the start of the school year.

Meadows Field Airport (BFL) – Jet Bridge HVAC Modernization

Our team successfully completed a comprehensive upgrade of the passenger boarding bridge HVAC systems at Meadows Field Airport in Bakersfield, California. The project scope included the full removal and replacement of all existing HVAC units across the terminal’s jet bridges, installation of new high-efficiency pentographs (400 Hz power conversion units), and complete replacement of wiring harnesses and power distribution components. The upgrade improves passenger comfort, significantly reduces energy consumption, enhances system reliability, and ensures compliance with current airport operational standards. Work was carefully coordinated with airport operations to minimize impact on flight schedules and maintain safety throughout the project.
Bubble Bonanza

Valley Plaza Kiosk

Clean Stride Raised Concrete Pad

A unique raised concrete pad and foundation were built for the commercial project of Clean Stride in Bakersfield, California. The project was completed with tight deadlines to ensure the space was ready for its grand opening. The construction team worked tirelessly to meet and exceed all requirements within the deadline and without any issues. We are proud that we completed this project on time and within budget, providing our customers with a beautiful space they can be proud of for years to come. The construction team worked diligently with great attention to detail, which is evident in the results of their hard work. We are pleased that Clean Stride can occupy a space they can be proud of and showcase their business’s commitment to quality. It has been an honor to work with them on this project!

Beechwood Condos

The condo revitalization project is now complete! The walls have been repainted with a fresh coat of paint, and the repairs to the building have been made in order to re-beautify this condo complex. With the combination of these efforts, the condo is now looking better than ever!